Q.What junction does the m62 join the m1
A.The M62 joins the M1 at junction 29. It was constructed between 1960 and 1976 and is 107 miles long. It cost an estimated £765 million to build.
Q.How many miles is a lap of the M25
A.The M25 motorway is 121 miles long. This is the same whichever direction you are travelling in. It cost £909 million and took 11 years to build.
Q.When did the M6 Toll Motorway open?
A.The M6 toll road opened on 14 Dec 2003. It cost £900 million to build & takes £45 million per year. The toll costs £4.50 for the 27 mile stretch.